Weitere Ideen von EVERSEA
Global Tech I Offshore Wind Farm

Global Tech I Offshore Wind Farm

- Der Windpark Global Tech I ist mit CMS ausgestattet.

- Der Windpark Global Tech I ist mit CMS ausgestattet.

Bold Tern Deployed at Global Tech I OWF

Bold Tern Deployed at Global Tech I OWF

EnBW‘s substation topside at the 288MW Baltic 2 offshore wind farm some 32km off the German island of Rugen. Built by German fabricator, WeserWind, the 4400-tonne unit was loaded out by the Abu Dhabi Mar shipyard in Kiel and towed by tugs to Sassnitz ahead of deployment (Courtesy EnBW).

EnBW‘s substation topside at the 288MW Baltic 2 offshore wind farm some 32km off the German island of Rugen. Built by German fabricator, WeserWind, the 4400-tonne unit was loaded out by the Abu Dhabi Mar shipyard in Kiel and towed by tugs to Sassnitz ahead of deployment (Courtesy EnBW).

EnBW Windpark Baltic 1

Der Einsatz erneuerbarer Energien führt naturbedingt zu Schwankungen in der Energieerzeugung. EnBW gleicht diese Schwankungen mit Pumpspeicherkraftwerken aus.

Baltic 1 Offshore Wind Farm, Courtesy EnBW.

Baltic 1 Offshore Wind Farm, Courtesy EnBW.

Off-shore wind farm: BARD Offshore 1, Germany (400 MW)

Off-shore wind farm: BARD Offshore 1, Germany (400 MW)