The Carport

Yes we can!
19 Pins7 Follower
Back side

Back side

The backside.

The backside.

7 Days from start to Roof framing. (Not including the Post ankers) We want to wait a few Weeks so the wood can dry properly before treating it with protection and color.

7 Days from start to Roof framing. (Not including the Post ankers) We want to wait a few Weeks so the wood can dry properly before treating it with protection and color.

.
.
The Roof is Don.

The Roof is Don.

First time installing Rain Gutters.

First time installing Rain Gutters.

DIY Extreme. My own building plan,  fresh cut Lumber from the Forestry Dept. and my own sweat and Blood put it together.

DIY Extreme. My own building plan, fresh cut Lumber from the Forestry Dept. and my own sweat and Blood put it together.

My Side.

My Side.

Her Side.

Her Side.


Weitere Ideen
Pinterest
Suchen